Archive for the ‘Building Performance Solutions’ Category

Performing Mechanical “Heart Surgery” at Atlanta Medical Center

Atlanta Medical Center, formally known as Georgia Baptist, was originally founded in 1901, and has been an Atlanta landmark since the 1940’s.  Last fall, McKenney’s worked in conjunction with The Segars Group on plans to replace the facilities aging central steam plant.   (more…)

Tags: Building Performance Solutions

Turnkey Delivery for Federal Laboratory

As prime contractor, McKenney’s Building Performance team delivered a turnkey laboratory for a large federal agency in Midtown Atlanta.

(more…)

Tags: Building Performance Solutions

Focusing on Safety, Quality, and Productivity at Ft. Benning

For the past 8 years McKenney’s Building Performance Team has been working with the United States Army Corps of Engineers and their project teams at Ft. Benning. Together we’ve been working on the renovation of their basic training barracks.  These barracks, referred to as “Starships”, are large 250,000+ sq. ft. facilities used for the housing and training of incoming new troops during basic training.  (more…)

Tags: Building Performance Solutions

Benefiting from Twelve Months Hard Time

Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia. We successfully delivered the project for the Georgia Department of Corrections starting with the development of an initial Energy Conservation Measure (ECM), then project design and finally completion ahead of schedule.

  (more…)

Tags: Building Performance Solutions

Leveraging McKenney’s In-house Resources to Solve a 110 °F Problem

By leveraging pre-planning, fabrication, and design-build processes, McKenney’s Building Performance team delivered a turnkey solution to a manufacturing facility where the production floor could reach +110°F with minimal impact on customer’s operations. McKenney’s experienced team of craftsmen installed the 300-ton cooling system in a single day.

(more…)

Tags: Building Performance Solutions