EMERGENCY CONTACT  |  ATLANTA | 404-624-8600       CHARLOTTE | 704-357-1616

Archive for October, 2015

Delivering a “Class A” Build-Out

Commercial Offices McKenney’s completed an office space build-out of HVAC, plumbing and piping on one floor of a multi-level office building in Atlanta, Georgia

(more…)

Tags: Project Highlights

Smart Plant Controllers – Are we there yet?

Syst_Int_Controls-3 Applied equipment systems still have a place in modern construction, but can equipment manufacturers really provide a productized plant solution?

(more…)

Tags: Systems Integration & Controls

Taking Command of Controls

buildingintelligence2_smallerMcKenney’s installed energy-saving direct digital controls (DDC) to existing HVAC systems in 77 buildings at a Georgia repair facility that supports a U.S military branch.

(more…)

Tags: Building Intelligence, Project Highlights

Retrocommissioning Gets Results

EnergywithwordsMcKenney’s dramatically improved energy efficiency at a corporate campus in Atlanta, following an HVAC system and controls retrocommissioning.

(more…)

Tags: Energy Services, Project Highlights

The New Data Center Energy Efficiency Guidelines: the Five Ws and an H

datacenters4In just over one year, it will be time to vote in the upcoming elections. Between the widely televised debates, heated exchanges and the mud-slinging, it feels more like the election is tomorrow! With so much time left, it would not be surprising if they ran out of topics to discuss. One thing that will likely not be discussed but that the new officials will need to consider once they take office is new energy efficiency guidelines for data centers. So, let’s use the “Five Ws and an H” method to break down the topic and make sure the voters are informed!

(more…)

Tags: Data Centers