EMERGENCY CONTACT  |  ATLANTA | 404-624-8600       CHARLOTTE | 704-357-1616

Setting the Bar High

EducationCheck out one of the latest projects by our Carolinas Division—the renovation of HVAC systems in a 30-story Charlotte office tower for a law school tenant.

 

The Challenge

The 10 floors of the heavily populated law school required more outside air than typical office space. The challenge–how to deliver the air thru an occupied high rise building while maintaining the budget and meeting the aggressive five-month project schedule.

 

The Solution

McKenney’s worked with the design team and decided that installing a 92-ton outside air unit on top of the building would be more cost effective than installing individual custom units above the ceilings on each floor. This approach saved the project approximately $200,000. Diligent field coordination between McKenney’s, the general contractor, police, local transit service, parking lot owners and insurance companies was necessary to ensure a safe and efficient helicopter lift process. An existing open shaft was used to install a duct riser from the roof down to the school’s ten floors.

 

The Results

McKenney’s delivered the project on time and within budget without any disruption to other tenants.

 

Have questions for our experts? Leave your comment below and check out our website for more information.

 

About Adrienne Vaughn

Website: http://www.mckenneys.com/
Email Address: adrienne.vaughn@mckenneys.com
Adrienne Vaughn
Adrienne Vaughn began at McKenney's in 2012 as a Marketing Coordinator and has since moved into the role of Marketing Specialist. With a degree in English from Georgia State University, she is responsible for the communications and messaging piece of the McKenney's brand.
Tags: Project Highlights

Leave a Reply